Five stages, each with defined inputs, outputs and a gate to the next.
The engagement lifecycle described elsewhere as a summary is set out here in full. Each stage states what it consumes, what it produces and the condition that must be met before the programme proceeds — so a buyer knows exactly what a stage delivers before committing to it.
Understand the estate before proposing a target.
Assessment establishes what is already running, what constrains change, who holds authority and what the real decision criteria are. It exists to prevent the most expensive failure mode in institutional delivery: a target architecture that cannot survive contact with the existing estate.
Inputs
Tender or requirement text, current-state documentation, stakeholder access and any constraints already known.
Outputs
A scoped assessment: findings, constraints, options and the sequencing and cost envelope needed for internal approval.
Gate
The buyer accepts the assessment findings and the scope on which design will proceed.
Decide the target and the route to it.
Design fixes the target state, the transition states between here and there, and the interfaces that decide feasibility. Where a technology choice is genuinely open, the alternatives and their consequences are recorded rather than quietly resolved in favour of one supplier.
Inputs
Accepted assessment, confirmed constraints and the buyer’s governance and security requirements.
Outputs
Target and transition architecture, interface and data-ownership definitions, and a validation approach.
Gate
Design reviewed against requirements and constraints; build is authorised.
Build against a fixed baseline.
Build and configuration proceed against acceptance criteria fixed before work began, under change control. Assumptions and agreed changes are recorded as they are made, so the reasoning behind the built system remains available months later.
Inputs
Authorised design, acceptance criteria and the change-control mechanism.
Outputs
Built and configured components with a change record and an as-built configuration baseline.
Gate
Build verified against design and change record before integration.
Prove the seams, not just the parts.
Interfaces are proven end to end, because in integration-heavy programmes the seams between systems — not any single component — carry the principal risk. Evidence is captured in a form that supports later audit, and issues are resolved against the baseline rather than worked around.
Inputs
Verified components, interface definitions and the agreed validation approach.
Outputs
End-to-end validation results and a requirements traceability record.
Gate
Acceptance criteria demonstrably met; sign-off recorded and retained.
Hand over something the buyer can run alone.
The measure of a good handover is whether the organisation’s own staff can run, monitor and troubleshoot the result without the supplier in the room. Runbooks, escalation contacts, a known-limitations register and training are delivered as part of scope, with continuity and exit arrangements described at proposal stage.
Inputs
Accepted solution, operational documentation and the agreed support model.
Outputs
Runbooks, escalation paths, a known-limitations register, training and a continuity arrangement.
Gate
The buyer confirms operational readiness and independent operability.
Working through a formal evaluation?
The capability statement and procurement pack are written for evaluation committees, technical reviewers and commercial teams reading in parallel.
