Defined acceptance criteria
The test set that will prove a requirement is agreed before build begins, so acceptance is a checklist both sides signed up to — not a debate at the end.
A programme succeeds when the buyer can demonstrate — to an auditor, a regulator or a successor — that what was delivered meets what was agreed. SODASUS builds that demonstrability in from the start, so quality is a recorded fact rather than an assertion made at handover.
The test set that will prove a requirement is agreed before build begins, so acceptance is a checklist both sides signed up to — not a debate at the end.
Each requirement can be followed from the tender text, through the architecture, to the validation step that demonstrates it and the record that it passed.
Defined gates where work is checked against the baseline by someone other than the person who produced it, with the outcome recorded.
Test results, configuration records and sign-offs are kept in a form that supports audit long after the delivery team has moved on.
Requirements agreed
Scope baseline versioned; acceptance criteria written down before design starts.Design reviewed
Architecture checked against requirements and constraints before build is authorised.Build verified
Configuration and code checked against the design and change record.Integration validated
Interfaces proven end to end, with evidence captured for review.Acceptance signed
Criteria demonstrably met; sign-off and records retained for audit.The capability statement and procurement pack are written for evaluation committees, technical reviewers and commercial teams reading in parallel.